01

Keep the structural value

The bridge uses two retired LM 13.4 turbine blades as its main girders. The Re-Wind project brought together research and engineering partners to assess the blades and develop the crossing in County Cork.

University College Cork’s February 2022 account describes a bridge intended for pedestrians, cyclists and emergency vehicles. That documented design is more specific than a general claim that old blades can be reused anywhere.

02

A new use needs a new engineering case

Our reading: the attractive move is retaining the component’s structural work instead of immediately treating it as feedstock. The change of use still requires assessment of condition, connections, loading and inspection.

A single demonstrator is a starting point for a repeatable method. It does not make every retired blade suitable, or remove the need to compare transport and adaptation with other options.

Sources (2)
  1. University College Cork · BladeBridge, February 2022
  2. Re-Wind · Construction record, January 2022
Have a correction or useful update? Let us know ↗